Chief engineer for construction:

VivaPalazzo Zrt.

General contractor:

Gábor Kis-Simon Deputy CEO

Development of Radnóti Miklós Primary School in Mori

The new building can be accessed from the central courtyard, opposite the entrance there is a staircase connecting the floors and a lift. The development rooms on the ground floor of the Kossuth Lajos Street wing are also accessible via a separate courtyard entrance. The main entrance provides access to the ground floor classrooms via the walkway, and at the end of the walkway – a separate wing for the gym – the changing rooms are located between the two wings, as specified in the design documentation. On the first floor there are classrooms, teaching rooms, a teacher’s room, a water block and a library/lecture room.

  • Main technical data (description of work parts, quantities, values):
  • Construction of a new two-storey wing (2304,47 m2) with full accessibility:
  • Installation of a total of 243 shutters,
  • Multi-capacity auditorium: 156,71 m2, library + 43,78 m2 club room
  • Tower room 493,29 m2,
  • 4 classrooms 210 m2, 7 development rooms for small groups
  • 1 barrier-free lift,
  • Schoolyard paving 654 m2, 437 m2 of grass, landscaping, barrier-free parking 1 unit
  • Solar PV system installation 35 kW inverter size.